
Add to Cart
This Railway Traverser is usually used at ship yard, plant and factory, certain production line. The Railway Traverser could get power from outside or from the battery. The Railway Traverser was developed to dramatically reduce the material handling requirements of cranes and fork trucks while providing quick, safe and smooth movement of materials and/or products through manufacturing facilities. Railway Traverser construction is based on our world renowned die Railway Traversers and provides controlled movement of heavy and oversized loads such as dies, coils and work in progress. Our Railway Traverser is available in a number of configurations specifically designed to suit the needs of our customers.
Model | BXC-2t | BXC-20t | BXC-50t | BXC-100t | BXC-150t | |
Rated Load(t) | 2 | 20 | 50 | 100 | 150 | |
Table Size(mm) | Length(L) | 2000 | 4000 | 5500 | 6500 | 10000 |
Width(W) | 1500 | 2200 | 2500 | 2800 | 3000 | |
Heigth(H) | 450 | 550 | 650 | 900 | 1200 | |
Wheel Base(mm) | 1200 | 2800 | 4200 | 4900 | 7000 | |
Rail Inner Gauge(mm) | 1200 | 1435 | 1435 | 2000 | 2000 | |
Wheel Diameter(mm) | 270 | 350 | 500 | 600 | 600 | |
Wheel Quantity | 4 | 4 | 4 | 4 | 8 | |
Ground Clearance(mm) | 50 | 50 | 50 | 75 | 75 | |
Running Speed(min) | 0-25 | 0-20 | 0-20 | 0-20 | 0-18 | |
Motor Power(kw) | 1 | 2.2 | 5 | 10 | 15 | |
Battery Capacity | 180 | 180 | 330 | 440 | 600 | |
Battery Voltage | 24 | 48 | 48 | 72 | 72 | |
Running time When Full Load | 4.32 | 4 | 3.3 | 3.2 | 2.9 | |
Running Distance for Once Charge(KM) | 6.5 | 4.8 | 4 | 3.8 | 3.2 | |
Reference Weight(t) | 2.8 | 5.9 | 8 | 14.6 | 26.8 | |
Recommended Rail Model | P15 | P24 | P43 | QU100 | QU100 |
1. Q: What is the size and load of this Railway Traverser ?
A:The size and load of our this Railway Traverser is customized design according to your requirement.
2. Q: How should I operate this Railway Traverser ?
A: The Railway Traverser is controlled by pendant & remote radio control. The controller could be push button or joy-sticker.
3. Q: Is there any braking system on this Railway Traverser ?
A: Yes, there are electromagnetic brakes on the Railway Traverser. When the Railway Traverser is power off, the brake will work automatically. And there are emergency stop buttons on the remoter and the Railway Traverser, you can push it for emergency stop.
4. Q:What is the warranty period? What kind of service do you offer in the warranty period?
A: The warranty period for our product is 12 months from the time we delivery, during the warranty period, we will send spare parts to you on our own cost if damaged because of bad quality, and we will guide you how to replace it. If necessary, our engineer is available to your factory for maintenance.
5. Q: How do you transport the Railway Traverser and what is the package ?
A: For the big part, we will pack it with tarpaulin and wood pallet on the bottom of the Railway Traverser to prevent it from moving. For the small part, we will pack it in wood case.
6. Q: What is the leading time, delivery term, and payment term ?
A: Usually our leading time is 45 days, for some special Railway Traverser, such as hydraulic lifting Railway Traverser, it maybe longer to 60 days. About the delivery term, we accept EXW, FOB, CIF, DDU. About the payment, we accept T/T or L/C.